Monday, February 28, 2011

New Look to #3 Tee

This past Friday we were able to get all the soil hauled in (and rough graded) that was needed for our project on #3 Tee.  We are splitting #3 tee up into 3 tees by elevating the middle third of the tee 18" and the back third 36".  This is being done to break up the "Runway tee" and to allow sight lines to the pond from any where on the tee.  The final grading, irrigation installation, and seeding will be completed this spring and the back two thirds should open for play by early summer.
We will also be adding a new blue/black tee for #12 and a new forward tee to #7.  All of this was done with the money that was donated by Stan Hollen and Mike Hilliard.

Clearing snow from the existing tee surface.

More snow clearing and attempting to strip top soil (it was too frozen).

Staking, hauling soil and shaping the middle third of the tee.

View from the 12th tee box.

Finishing the shaping of the middle third and staking the back third.

Finishing the shaping of the back third and hauling in some top soil for the both back tiers.

View from the 12th tee.

No comments:

Post a Comment